Detection of failed heating elements in electric furnaces, calculation, manufacture and replacement of new elements; check of phase balance and connections.
Scope
- Element resistance and insulation measurements
- New element design and manufacture by power and surface load
- Replacement, connection and phase balance check
- Check of thyristor/contactor and fuse circuits
Send us your furnace type, make and the problem via the contact form or call +90 533 945 27 94; we will come back with a site survey and an itemised quotation.

